
Case study
Limhamn
Client: MVB Syd
Assignment: Water purification with regard to particles and chlorinated solvents.
Scope: In a development project in Limhamn, the construction contractor carried out groundwater lowering in the limestone. When elevated levels of chlorinated solvents were detected (approx. 30ug / l), groundwater treatment had to be carried out in one of the drilled wells. Then, the project required a flow capacity of up to 30 m3/h. Envytech’s solution could be established in less than 3 days, which meant that the groundwater lowering and construction could continue according to plan with minimal downtime.
